Equestrian Center Facilities and Contacts

Facility Expansion and Improvements

Phase 1 - Construction began in 2012

In 2012, Miami committed funds for Phase I construction which elevated the equestrian center 8 feet, adding 60,000 cubic yards of fill to raise the site out of the flood plain.

Site Improvements

  • A 14,000 square foot barn expansion that is equipped with a fire suppression sprinkler system
  • 58 stalls one of which is equipped with cameras to provide 24 hour watch on a horse as needed
  • Four wash stalls with hot & cold water, two of which are equipped with radiant heat
  • A team tack room with show trunks, lockers and access to personal saddle racks
  • A school tack room with 45 saddle racks and 120 bridle racks
  • A laundry room with two industrial washers and dryers and ice machine
  • 150' x 300' outdoor riding riding arena with state of the art of footing, irrigation and drainage

The current site upgrades have been designed to support an indoor arena without major changes to the existing footprint.

Phase 2 - Gift given to begin indoor arena construction in 2019

Interior view of the indoor arena with 久久热视频s riding horses in the center of the large open barnIn 2019 the university received a lead gift to begin the indoor arena construction.

Construction was completed in June of 2021 and includes:

  • 120 by 250 indoor riding arena
  • Bleacher seating for 150 spectators with radiant heat and fans
  • 3 large fans over the riding surface
  • Overhead arena watering system

We are still actively fundraising for this phase and look forward to being able to move towards our phase 3. To support this initiative contact 久久热视频 Advancement Susie Sadler, Assistant Vice President of Development, sadlers@MiamiOH.edu 513-529-9217.

Phase 3 - Support future improvements

We are looking forward to the opportunity to continue with the equestrian center improvements. Upon completion of the fundraising goal for phase 2 we will begin fundraising for phase 3 which will include the following:

  • Classroom
  • Offices
  • Viewing Lounge
  • Locker Rooms
  • Connection from barn to indoor arena

To support this initiative contact 久久热视频 Advancement Susie Sadler, Assistant Vice President of Development, sadlers@MiamiOH.edu 513-529-9217.

Equestrian Center Staff

Amanda Wasser

Amanda Wasser

Assistant Director
wassera2

Tess Von Hemel

Tess Von Hemel

Instructional Intern
vonhemt

Contact Us

About

Miami Recreation prides itself on its commitment to meeting the diverse recreational needs of its patrons. With state-of-the-art fitness centers, a wide range of programs and services, and outdoor adventure opportunities, Miami Recreation offers something for everyone. Miami Recreation is dedicated to enhancing the physical, mental, and social aspects of community well-being.

Finance and Business Services